ENGINEERING / PROJECT MANAGEMENT DIVISION

    

DEPARTMENT PROFILE

Public Works Engineering is responsible for projects designed and managed with in-house staff as well as by professional consultants.  Work includes major project management, drainage and sewer master planning, pavement management, general surveying, engineering, technical oversight and review, construction drawings and contract document preparation, construction quality assurance, contract administration, and inspection related to capital improvement, utility pubic encroachment, and development entitlement.  Typical projects include arterial highway rehabilitation and reconstruction, drainage, sewer, and water improvement together with various special projects.

Construction Engineering is responsible for construction management of the City’s Capital Improvement Program.  This unit also provides contract administration and construction inspection to ensure timely and high quality completion of projects.  Field inspectors provide construction inspection services for on-site grading and all work done in the Public right-of-way, including work done under a Public Works Permit.

For more information on Pubic Works Engineering or Construction, please call (818) 224-1600.

 

The Public Works Public Counter Hours:
Monday-Thursday: 7:30a.m.-5:30p.m.
Friday: 7:30a.m.-2:00p.m.

100 Civic Center Way
Calabasas, CA 91302
Tel. (818) 224-1600
Fax (818) 225-7356

 
STAFF
Robert Yalda, P.E., T. E.
Public Works Director/City Engineer
 
Engineering / Project Management Division

     Andrew Brozyna, P.E., Deputy Public Works Director
    
Anthony Aguilar, Associate Engineer
     Anita Davidoo, Associate Engineer
     Pauline Rubio-Brownell, Executive Assistant
     Mirvat Yacoub, Consultant (Drainage Study)

 
Public Works Organizational Chart
 
LAND DEVELOPMENT
FORMS

Form B - Project Initial Submittal Checklist
Form K - Acknowledgement Concerning the Employment of Engineers
Form L - Grading Permit Cash Bond

Form M - Performance Security Grading Bond
Form O - Supervised Rough Grade Inspection Verification
Form P - Final Grade Inspection Verification
Form Q - Pad Certification
Form R - Release of Original Signed Drawings
Form I - Environmental Mitigation Plans Checklist
202-GUIDELINES FOR GRADING PREPARATION
203-LAND DEVELOPMENT PROJECT REVIEW SUBMITTAL
217-AS BUILT PLAN PREPARATION PROCEDURE
Sanitation Maintenance Bond
AutoCAD Border and Title Sheets

Conceptual Grading and Drainage Plans (zip)
Precise Grading and Drainage Plans (zip)
Traffic Signal & Striping Plans (zip)
Street Improvement Plans (zip)

City of Calabasas © 2009